Highlight Projects

WFI > ToxSorb > Projects

In-process project stories

Saving water and costs, with reduced brine
Location: Italy
Project Type: Industrial wastewater treatment

This metal plating plant wanted a new way to treat its industrial wastewater. To comply with local regulations and save costs, the company needed to save water and minimize production of chemicals and sludge, thus reducing disposal costs. The ToxSorb solution includes design and construction of a new wastewater treatment system for removing Hexavalent Chromium from the process water. Based on ToxSorb’s MAC NP2 technology, the new system can operate with near-Zero Liquid Discharge
ZLD) and enable significant brine, water and cost savings.

Cost-effective, high-efficiency wastewater treatment
Location: Italy
Project Type: Industrial wastewater treatment

Aiming to reduce its water costs and produce high-quality wastewater, with minimized brine discharge and disposal, a metal plating factory turned to ToxSorb. The new Chromium wastewater treatment solution improves the efficiency of the di-ionized system in the general stream. With ToxSorb’s solution based on MAC technology, the factory gets a cost-effective way to reduce its water consumption and sludge production, while meeting regulatory requirements.

Higher water quality, higher sustainability
Location: USA
Project Type: Industrial wastewater treatment

A metal plating factory was looking for a way to remove Chromium and other salts from the final Chromium rinsing basins in its production lines. With ToxSorb’s MAC technology-based system, the plant can get water of significantly higher quality in-line, while reducing its water consumption, wastewater discharge, chemicals consumption and sludge.

Efficient wastewater reuse for increased production
Location: Italy
Project Type: Industrial wastewater treatment

ToxSorb’s MAC technology-based wastewater treatment solution is designed to remove aluminum from this metal plating plant’s industrial wastewater. By reducing the discharge of the wastewater to sewage (Zero Liquid Discharge) and maintaining the high quality of water needed for production, the solution allows the factory to significantly increase production while minimizing its water consumption.

Enhanced water treatment, with low OPEX
Location: Italy
Project Type: Industrial wastewater treatment

This metal plating plant wanted to improve its wastewater treatment process while keeping treatment costs low. ToxSorb offered a solution, based on its proprietary MAC technology, to selectively remove Chromium from the industrial wastewater, decreasing operational and maintenance costs.

Get help with your project
Looking to gain more from water? Let's talk.